Before & After
Palm Beach County Kitchens, Before and After
Five completed kitchen projects photographed at intake and again after the punch list closed. No staging tricks, no borrowed photos, no invented reviews.
Completed projects
Scope notes describe what actually changed in each kitchen.
Before
AfterFull cabinet and counter replacement — West Palm Beach
Oak boxes were removed, walls floated flat, new shaker cabinetry set to level, and quartz templated after the boxes were fixed in place.
Before
AfterCondo galley opened up — Boynton Beach
One upper run was removed and rebuilt shorter, lighting was replaced with recessed cans plus pendants, and the flooring continued through to the dining area.
Before
AfterSink base rebuild after a slow leak — Lake Worth Beach
The failed base was replaced with a moisture-resistant box, the counter section was re-cut, and the drain and supply lines were reset correctly.
Before
AfterNew island with seating — Wellington
The tiled island was demolished, the base widened for seating, electrical rerouted for code-compliant outlets, and a waterfall quartz top installed.
Before
AfterRange wall and venting update — Delray Beach
Old tile came off to the studs, the wall was patched and waterproofed, ducting was corrected, and new tile was set with a matched grout joint.
Ready to price your kitchen?
Send the details through our Assistant and a dispatcher will confirm your on-site measure. Nothing is booked until you approve the scope.